The Skirball Bridge will be closed nightly from 10 p.m.-6 a.m. for three months while a contractor does utility relocation work, according to Metro. The closure is scheduled to begin on Thursday, Oct. 20. See the original post: Be Prepared! The ‘Rampture’ Is Coming
Read the original:
Be Prepared! The ‘Rampture’ Is Coming